header1

Library Campaign

Final Phase

The first floor of the library will be transformed to include a renovated art gallery, group study space, Instruction Design Center, Student Media Center and training labs. More information to come. 

Naming Opportunities

Pervasive Technology for the Library   $1,000,000
Art Gallery $250,000
Instructional Design Center      $175,000
Student Media Center $150,000
Training Lab $150,000